Articles Tagged "Kilgore gold project"

Bayswater: $2.5 Million Drilling Program Planned at Kilgore gold project

Bayswater Uranium Corporation reports that a $2.5 million drilling program is planned at the Kilgore gold project in Clark County, Idaho. Otis has signed an agreement with Timberline Drilling Inc, of Coeur d’Alene, Idaho to supply two core rigs to drill at Mine Ridge. Drilling will be on a 24-hour basis, with approximately 6,000 metres spread between [...]

Drilling at Bayswater’s Kilgore Gold Project

Bayswater Uranium reports it has received additional positive drill results from the Kilgore gold project  in Clark County, Idaho. These results in combination with other significant bulk-tonnage intercepts determined for a number of Otis’s other holes drilled in the Kilgore deposit Mine Ridge core target area (see October 13 and December 15, 2009 news releases) indicate [...]

Bayswater reports drill results from Otis gold JV

Bayswater Uranium Corporation reports results from drilling at the Kilgore gold project in Clark county, Idaho. Based on recently obtained additional geochemical assay results, three of the four core holes drilled in November and December 2008 contain significant bulk-tonnage, open-pittable thicknesses and grades, in addition to the high-grade, underground-type intercepts previously reported by Otis on March 2, [...]