Articles Tagged "in-situ recovery"

Uranium Energy Corp advances in obtaining permit

Uranium Energy Corp (AMEX:UEC) reports it is on the verge of acquiring approval for production at its Goliad in-situ recovery project, South Texas. According to the company, the administrative judge has findings in favour of the company on the vast majority of the issues and has also recommended the Texas Commission on Environmental Quality (TCEQ) to allow [...]

Bayswater Receives Drilling Permit & Commences Drilling

Bayswater Uranium (CVE:BYU, OTC:BYSWF) reports that it has received approval of its drilling notification permit from the Wyoming Department of Environmental Quality and its Monitoring Well permits from the Wyoming State Engineer’s Office. The Company has commenced drilling and installing up to 44 baseline monitoring wells in the area of its proposed Uranium In Situ Recovery mine and plant [...]

Uranium Energy Corp Provides Project and Corporate Update

Uranium Energy Corp reports a near-term production update on each of its Palangana and Goliad in-situ recovery uranium projects and an update on its current and anticipated balance sheet and capital structure. Palangana ISR Project: The Company’s technical team, including recent hires from Uranium One, is at present on the ground at the 100%-controlled Palangana project in [...]

NRC accepts uranium company application

Rapid City Journal reports the Nuclear Regulatory Commission has accepted a revised application for a uranium recovery license from Powertech USA. Powertech USA, a subsidiary of Powertech Uranium Corp. of Canada, plans to inject chemically treated water into holes to dissolve uranium, then pump out the solution and collect the uranium for processing. The method is called [...]

Uranium Energy Corp issued final draft permits

Uranium Energy Corp reports that TCEQ has completed final draft permits for the two non-hazardous disposal wells that are planned as part of in-situ recovery of uranium at Goliad project, South Texas. In accordance with the rules, the issuance of the Final Draft Permits will be published in local newspapers. The Company is also pleased to [...]

Ur-Energy reports new schedule requirements

Ur-Energy Inc. reports it has received new guidance from the Nuclear Regulatory Commission (NRC) concerning its’ schedule for the first 3 pending applications for In Situ Recovery (ISR) operations. The pending ISR applications with the NRC have all been tied to the ISR Generic Environmental Impact Statement (GEIS), which was originally scheduled for publication in January 2009 and [...]

Uranerz reports uranium leaching amenability

Uranerz Energy Corporation reports leach test results from core samples taken from Doughstick property and South Doughstick property, Pumpkin Buttes uranium district. The Pumpkin Buttes Uranium District, located in the central Powder River Basin of Wyoming, is home to Areva and EDF’s Christensen Ranch in-situ recovery (“ISR”) mine, and Cameco’s North Butte ISR uranium project. Glenda Thomas, Uranerz [...]

Uranium Energy Corp completes filing of final permit

Uranium Energy Corp  reports it has filed all permit applications for in-situ recovery of uranium at the Company’s flagship Goliad project, South Texas. On December 1, Uranium Energy filed a Radioactive Material License Application (RMLA) and a Permit by Rule Application (PBRA) with the Texas Commission on Environmental Quality (TCEQ), the final two applications that needed [...]

Powertech Uranium reports corporate update

Powertech Uranium reports significant progress in the mine permit applications for the Dewey-Burdock project, Colorado. All base line studies to support the mine permit applications at Dewey-Burdock have been completed. These include radiation data collection, air monitoring, groundwater sampling, stream sampling, soil sampling, floodplain and vegetation analyses, and archaeology. For full details of this press release, click this link. To view [...]